• Article  

      A bid-unbalancing method for lowering a contractor's financial risk 

      Christodoulou, Symeon E. (2008)
      A method is presented for unbalancing bids and optimizing the allocation of overall project profits to individual activities by considering the financial parameters of a project (bid mark-up and projected cash flow), in ...
    • Article  

      Entropy-Based Heuristic for Resource-Constrained Project Scheduling 

      Christodoulou, Symeon E. (2016)
      A heuristic is presented for the resource-constrained project scheduling problem (RCPSP), based on maximizing the entropy of the project's resource histogram. The proposed RCPSP algorithm makes use of the general theory ...