dc.description.abstract | A method is presented for resource allocation and scheduling of resource-constrained projects by use of a measure of the projects' entropy. The entropy, as a measure of the degree of disorder in a system, is an indicator of a project's tendency to progress out of order and into a chaotic condition and it can thus serve to forecast a project's development. The entropy metric used in the analysis is based on the resource assignments per activity (required vs. assigned resource units). " | en |
dc.source | Automation in Construction | en |
dc.source.uri | http://www.sciencedirect.com/science/article/pii/S0926580509000594 | |
dc.subject | Entropy | en |
dc.subject | Resource-constrained construction scheduling | en |
dc.title | Entropy-based scheduling of resource-constrained construction projects | en |
dc.type | info:eu-repo/semantics/article | |
dc.identifier.doi | 10.1016/j.autcon.2009.04.007 | |
dc.description.volume | 18 | |
dc.description.issue | 7 | |
dc.description.startingpage | 919 | |
dc.description.endingpage | 928 | |
dc.author.faculty | Πολυτεχνική Σχολή / Faculty of Engineering | |
dc.author.department | Τμήμα Ηλεκτρολόγων Μηχανικών και Μηχανικών Υπολογιστών / Department of Electrical and Computer Engineering | |
dc.type.uhtype | Article | en |
dc.contributor.orcid | Ellinas, Georgios N. [0000-0002-3319-7677] | |
dc.gnosis.orcid | 0000-0002-3319-7677 | |