dc.description.abstractA method is presented for allocating resources to construction activities and for scheduling construction projects under resource constraints by considering the effects that such resource limitations may have on the tendency of the activities (and the project in general) to fall into disarray and behind schedule. Resource-constrained scheduling problems (RCSP) are very common in real-life construction projects and because of their nature their numerical solution is computationally intensive. The method utilizes a measure of each activity's perceived level of disorder stemming from resource limitations. The proposed technique aims to optimize the number of resources assigned to the activities and to schedule the project so as to minimize the overall project's tendency to fall into disorder. The entropy-like metric used in the scheduling optimization is related to the ratio of required over-assigned resource units per activity, and its utilization allows a planner to take into consideration project disorder when planning a project. A case study and its mathematical framework help demonstrate the 'duration vs. disorder'trade-off analysis that planners should perform when considering possible activity resource assignments and the feasibility of these assignments in terms of induced disorder. The entropy optimization method proves to be a powerful project-planning metric.en
dc.sourceConstruction Management and Economicsen
dc.source.urihttp://linksource.ebsco.com/linking.aspx?sid=ProQ%253Acivilengineering&fmt=journal&genre=article&issn=01446193&volume=27&issue=3&date=2009-01-01&spage=229&title=Construction+Management+and+Economics&atitle=Disorder+considerations+in+resource-constrained+scheduling&au=Christodoulou%252C+Symeon+E%253BEllinas%252C+Georgios+N%253BAslani%252C+Pooyan&isbn=&jtitle=Construction+Management+and+Economics&btitle=&id=doi:10.1080%252F01446190802635416
dc.source.urihttp://www.informaworld.com/smpp/content~content=a909814345~db=all~order=pa
dc.subjectMathematical modelsen
dc.subjectOptimizationen
dc.subjectArticleen
dc.subjectDisordersen
dc.subjectEntropyen
dc.subject80: management and marketing (ce)en
dc.subjectCivil engineering (ce)en
dc.subjectComputationen
dc.subjectConstructionen
dc.subjectFeasibilityen
dc.subjectSchedulesen
dc.subjectSchedulingen
dc.subjectStemmingen
dc.subjectUtilizationen
dc.titleDisorder considerations in resource-constrained schedulingen
dc.typeinfo:eu-repo/semantics/article
dc.identifier.doi10.1080/01446190802635416
dc.description.volume27
dc.description.issue3
dc.description.startingpage229
dc.description.endingpage240
dc.author.facultyΠολυτεχνική Σχολή / Faculty of Engineering
dc.author.departmentΤμήμα Ηλεκτρολόγων Μηχανικών και Μηχανικών Υπολογιστών / Department of Electrical and Computer Engineering
dc.type.uhtypeArticleen
dc.source.abbreviationConstr.Manage.Econ.en
dc.contributor.orcidEllinas, Georgios N. [0000-0002-3319-7677]
dc.gnosis.orcid0000-0002-3319-7677


Files in this item

FilesSizeFormatView

There are no files associated with this item.

This item appears in the following Collection(s)

Show simple item record