Browsing Τμήμα Πολιτικών Μηχανικών και Μηχανικών Περιβάλλοντος / Department of Civil and Environmental Engineering by Subject "Yes: (AN)"
Now showing items 1-1 of 1
-
Article
Entropy-Based Heuristic for Resource-Constrained Project Scheduling
(2016)A heuristic is presented for the resource-constrained project scheduling problem (RCPSP), based on maximizing the entropy of the project's resource histogram. The proposed RCPSP algorithm makes use of the general theory ...