Scheduling Resource-Constrained Projects with Ant Colony Optimization Artificial Agents
(2010)
The paper presents a methodology to schedule resource-constrained construction projects by use of algorithms based on ant colony optimization (ACO)
The Science in Human Intuition: Optimum Bid Markup Calculations in Competitive Bidding Environments Using Probabilistic Neural Networks
(2000)
The study presented in this paper seeks the development of a model to be used by the construction industry for optimum bid markup calculations in static and non-static competitive bidding environments. The framework presented ...
Disorder considerations in resource-constrained scheduling
A method is presented for allocating resources to construction activities and for scheduling construction projects under resource constraints by considering the effects that such resource limitations may have on the tendency ...