Search
Now showing items 1-2 of 2
Vulnerability of Urban Water Distribution Networks under Intermittent Water Supply Operations
(2016)
The work presented herein investigates the effects of intermittent water supply (IWS) on the condition and breakage rate of urban water distribution piping networks (WDN), by studying the change in the rate of occurrence ...
Entropy-Based Heuristic for Resource-Constrained Project Scheduling
(2016)
A heuristic is presented for the resource-constrained project scheduling problem (RCPSP), based on maximizing the entropy of the project's resource histogram. The proposed RCPSP algorithm makes use of the general theory ...