Search
Now showing items 1-3 of 3
Scheduling Resource-Constrained Projects with Ant Colony Optimization Artificial Agents
(2010)
The paper presents a methodology to schedule resource-constrained construction projects by use of algorithms based on ant colony optimization (ACO)
Construction imitating ants: Resource-unconstrained scheduling with artificial ants
(2009-05)
The paper presents a methodology to arrive at critical path calculations in construction networks by imitating the natural selection processes utilized by real-life ants in search of shortest paths to a food source, and ...
Entropy-Based Heuristic for Resource-Constrained Project Scheduling
(2016)
A heuristic is presented for the resource-constrained project scheduling problem (RCPSP), based on maximizing the entropy of the project's resource histogram. The proposed RCPSP algorithm makes use of the general theory ...