Show simple item record

dc.contributor.authorChristodoulou, Symeon E.en
dc.contributor.authorEllinas, Georgios N.en
dc.contributor.authorAslani, Pooyanen
dc.creatorChristodoulou, Symeon E.en
dc.creatorEllinas, Georgios N.en
dc.creatorAslani, Pooyanen
dc.date.accessioned2019-04-18T06:18:49Z
dc.date.available2019-04-18T06:18:49Z
dc.date.issued2009
dc.identifier.urihttp://gnosis.library.ucy.ac.cy/handle/7/45320
dc.description.abstractA method is presented for resource allocation and scheduling of resource-constrained projects by use of a measure of the projects' entropy. The entropy, as a measure of the degree of disorder in a system, is an indicator of a project's tendency to progress out of order and into a chaotic condition and it can thus serve to forecast a project's development. The entropy metric used in the analysis is based on the resource assignments per activity (required vs. assigned resource units). "en
dc.sourceAutomation in Constructionen
dc.subjectEntropyen
dc.subjectResource-constrained construction schedulingen
dc.titleEntropy-based scheduling of resource-constrained construction projectsen
dc.typeinfo:eu-repo/semantics/article
dc.identifier.doihttp://dx.doi.org/10.1016/j.autcon.2009.04.007
dc.description.volume18
dc.description.issue7
dc.description.startingpage919
dc.description.endingpage928
dc.author.facultyΠολυτεχνική Σχολή / Faculty of Engineering
dc.author.departmentΤμήμα Πολιτικών Μηχανικών και Μηχανικών Περιβάλλοντος / Department of Civil and Environmental Engineering
dc.type.uhtypeArticleen
dc.contributor.orcidChristodoulou, Symeon E. [0000-0002-9859-0381]
dc.gnosis.orcid0000-0002-9859-0381


Files in this item

FilesSizeFormatView

There are no files associated with this item.

This item appears in the following Collection(s)

Show simple item record